GlobalMap

Past 7 days

Utilities and communications — Samara

Water, heating, electricity, gas and communications. A selection from the past 7 days within the 5000 latest geographically linked publications.

Place. Source. Context.

Open a report on the map or narrow your selection by topic.

Publications in selection
4
Matching your filters
4
Sources in selection
3

News map

Read feedLoading publications…
Map legend

Markers show locations mentioned in reports. “Show icons” enables event symbols. Choose an event type below to filter the selection.

Resolved, cancelled and refuted events use a neutral icon. The exact location is not always known.

The map shows up to 3,000 publications from this selection.

Publications on the map

Select a marker or a list item to read the publication.

In this selection

Publication time—
A marker indicates the place mentionedCity and area coordinates are approximate.How locations are determined

Find your topic

Topics from the past 7 days

All topics

Reports from sources

Publications on this topic

By city

The feed below shows this page’s publications. Map filters apply to the selection loaded on the map.

  1. Utilities and communicationsPlanned

    Samara City Duma deputies inspected major repairs to apartment buildings in three districts Inspections took place in the Samarsky, Leninsky, and Kirovsky districts. At the building at 101 Kuibysheva Street, Building 1, roof, facade, and foundation repairs are planned for next year; documentation is being prepared. Participants paid particular attention to the half-timbered building at 75 Frunze Street, Building 2. Foundation reinforcement was completed there this year, and roof and facade…

    Read full publicationCollapse publication
    Samara City Duma deputies inspected major repairs to apartment buildings in three districts Inspections took place in the Samarsky, Leninsky, and Kirovsky districts. At the building at 101 Kuibysheva Street, Building 1, roof, facade, and foundation repairs are planned for next year; documentation is being prepared. Participants paid particular attention to the half-timbered building at 75 Frunze Street, Building 2. Foundation reinforcement was completed there this year, and roof and facade repairs are planned for 2027; the project is ready. The building at 4 Repina Street needs major roof repairs; at 256 Leninskaya Street, in addition to the roof, the facade and utility systems need renovation. At 18 Ulyanovskaya Street, utility lines are planned to be replaced next year; bidding is currently underway to select a contractor for roof repairs. Subscribe to @truekpru63 | We are on MAX
    Publication page@truekpru63 on Telegram
  2. Utilities and communicationsPlanned

    ‼️Residents of Samara’s Kirovsky and Promyshlenny districts may be left without hot water The reason is work on the heating network along Kirov Avenue, being carried out by the company T Plus to improve the reliability of heat supply to residents. In some buildings, heating and hot water supply will be temporarily restricted, the company reported on November 23. Samara State Television and Radio Broadcasting Company ⚠️ Attention! Operational channels for monitoring the situation: ⚡ RADAR 63…

    Read full publicationCollapse publication
    ‼️Residents of Samara’s Kirovsky and Promyshlenny districts may be left without hot water The reason is work on the heating network along Kirov Avenue, being carried out by the company T Plus to improve the reliability of heat supply to residents. In some buildings, heating and hot water supply will be temporarily restricted, the company reported on November 23. Samara State Television and Radio Broadcasting Company ⚠️ Attention! Operational channels for monitoring the situation: ⚡ RADAR 63 REGION — threat monitoring 💥 URGENT SAMARA — breaking news 🚨 SAMARA EMERGENCIES — all about incidents 💬 Join the chat — let’s talk here Subscribe so you don’t miss important news
    Publication page@chp_samara on Telegram
  3. Utilities and communicationsPlanned

    Heating and hot water disruptions may occur in two districts of Samara. Residents of Kirovsky and Promyshlenny districts may be affected on November 23. Heating and hot water temperatures may drop in homes, social facilities, and institutions. Supply of heat and hot water will be briefly restricted in some buildings. The cause is work on the heating network on Kirov Avenue. The work is scheduled to be completed by the end of the day. Subscribe to @truekpru63 | We’re on MAX

    Publication page@truekpru63 on Telegram
  4. Utilities and communicationsPlanned

    Temperatures for heating and hot water may drop in two districts of Samara Disruptions are possible in the Promyshlenny and Kirovsky districts due to work on the heating network on Kirov Avenue. The repair is expected to be completed by the end of the day. 🔴 Subscribe | Send a news tip

    Publication page@samartop on Telegram