Residents and entrepreneurs of Sevastopol had many questions about compensation for part of the cost of purchasing uninterruptible power supplies (UPS). Following a live broadcast on STV, I instructed the Department of Economic Development to consider including UPS units in the compensation program. The issue has been resolved — amendments have been made to the procedure for providing the support measure. Now a UPS with a built-in battery is counted as a portable power station. If it has no…
Past 7 days
Economy — Sevastopol
Businesses, employment, trade and the local economy. A selection from the past 7 days within the 5000 latest geographically linked publications.
Place. Source. Context.
Open a report on the map or narrow your selection by topic.
- Publications in selection
- 1
- Matching your filters
- 1
- Sources in selection
- 1
Loading the map…
The map is currently unavailable. Read the publications
Publications on the map
Select a marker or a list item to read the publication.
In this selection
A marker indicates the place mentionedCity and area coordinates are approximate.How locations are determined
Find your topic
Topics from the past 7 days
Reports from sources
Publications on this topic
The feed below shows this page’s publications. Map filters apply to the selection loaded on the map.
-
EconomyOngoingResidents and entrepreneurs of Sevastopol had many questions about compensation for part of the cost of purchasing uninterruptible power supplies (UPS). Following a live broadcast on STV, I instructed the Department of Economic Development to consider including UPS units in the compensation program. The issue has been resolved — amendments have been made to the procedure for providing the support measure. Now a UPS with a built-in battery is counted as a portable power station. If it has no built-in battery, the UPS is counted as an inverter in a set of equipment. The support measure is calculated for the required equipment components: ▫️ for a power station — an inverter (UPS) and battery/batteries; ▫️ for a solar power station — a set of solar panels, an inverter (UPS), and a battery (batteries), or a set of solar panels and a portable power station (UPS). A controller is not a required component. The changes take effect from the start of application intake — November 16, 2026. As a reminder, compensation for residents will be 50% of the equipment cost, and for legal entities and individual entrepreneurs — 30% of the cost of the purchased equipment. More information is available by calling the hotline at 122 (extension 4).