GlobalMap

Past 7 days

Education — Tolyatti

Schools, nurseries, universities and learning. A selection from the past 7 days within the 5000 latest geographically linked publications.

Place. Source. Context.

Open a report on the map or narrow your selection by topic.

Publications in selection
1
Matching your filters
1
Sources in selection
1

News map

Read feedLoading publications…
Map legend

Markers show locations mentioned in reports. “Show icons” enables event symbols. Choose an event type below to filter the selection.

Resolved, cancelled and refuted events use a neutral icon. The exact location is not always known.

The map shows up to 3,000 publications from this selection.

Publications on the map

Select a marker or a list item to read the publication.

In this selection

Publication time—
A marker indicates the place mentionedCity and area coordinates are approximate.How locations are determined

Find your topic

Topics from the past 7 days

All topics

Reports from sources

Publications on this topic

By city

The feed below shows this page’s publications. Map filters apply to the selection loaded on the map.

  1. EducationPlanned

    🏫 Buildings of a social-pedagogical college in Tolyatti will be renovated for 152 million rubles A tender has been announced for the major renovation of buildings and non-residential premises in two educational buildings at 84 Muryseva Street and 28 Leningradskaya Street. The initial cost of the work is 152 million rubles. The contractor will be selected after December 11. – In the building at 84 Muryseva Street, the roof and facade, classrooms, corridors, stairwells, and restrooms will be…

    Read full publicationCollapse publication
    🏫 Buildings of a social-pedagogical college in Tolyatti will be renovated for 152 million rubles A tender has been announced for the major renovation of buildings and non-residential premises in two educational buildings at 84 Muryseva Street and 28 Leningradskaya Street. The initial cost of the work is 152 million rubles. The contractor will be selected after December 11. – In the building at 84 Muryseva Street, the roof and facade, classrooms, corridors, stairwells, and restrooms will be renovated. The water supply, wastewater, heating, and power systems will also be replaced, along with upgrades to the fire alarm, cable networks, and emergency exits. – In the building at 28 Leningradskaya Street, the restrooms, rooms on floors 1–3, the gym annex, stairwells, facade, paving around the building, and porches will be repaired. The water supply, wastewater, fire water supply, and heating systems will also be replaced, electrical work will be carried out, and outdoor lighting will be upgraded. The major renovation must be completed from January 12 to July 30, 2027. 🔴 We publish all important information about attacks on the region in our dedicated channels👇 URGENT TOLYATTI TOLYATTI CHANNEL ❗️Have details (photos/videos) from the scene? Send them to @pro163predlozhkabot
    Publication page@tlt_63ru on Telegram