GlobalMap

People in the news

Ansar Aidarov

Publications mentioning this name from different sources.

1 publications in the archive

  1. · @tengrinews · Almaty

    First gas turbine at Almaty CHP-2 starts up and synchronizes with Kazakhstan’s power system

    In this publication: Chairman of the Board of Samruk-Energy JSC

    First megawatts from Almaty CHP-2 after conversion to gas At the site of Almaty CHP-2, as part of commissioning work, the first Siemens gas turbine was successfully hot-started and then synchronized with Kazakhstan’s power system. The turbine rotor speed reached 3,000 rpm. It was also successfully synchronized with the electrical grid at a frequency of 50 Hz. The turbine delivered 10 MW of capacity. “The successful start-up of the gas turbine, delivering the first megawatts to the country’s power system, confirms the high reliability of the i…

    Full text
    First megawatts from Almaty CHP-2 after conversion to gas At the site of Almaty CHP-2, as part of commissioning work, the first Siemens gas turbine was successfully hot-started and then synchronized with Kazakhstan’s power system. The turbine rotor speed reached 3,000 rpm. It was also successfully synchronized with the electrical grid at a frequency of 50 Hz. The turbine delivered 10 MW of capacity. “The successful start-up of the gas turbine, delivering the first megawatts to the country’s power system, confirms the high reliability of the installed equipment and the coordinated work. Reaching this stage allows us to move on to final load testing,” said Ansar Aidarov, Chairman of the Board of Samruk-Energy JSC. More details Material provided by Samruk-Energy JSC

This selection groups mentions by full name; namesakes may appear together. Statements and descriptions belong to the linked sources.