Education · Ryazan
Foundation work at Ryazan School No. 28 to be completed by year-end
EducationOngoing
AI translation of the original report. Names and wording may contain translation errors. Read the original text
City Hall: the foundation of the building at School No. 28 in Ryazan will be completed by the end of the year
Currently, an excavation pit and pile field are being developed at the site, and the design documentation is being revised in accordance with current codes and regulations. In June 2026, Ryazan residents had already complained about the pace of construction. One resident said that the same scene was visible from her windows every day: only a few piles were driven into one pit, while a second one stood empty. According to her, construction waste and felled trees were not removed from the site. Construction of the school began in 2025. It was planned to be completed by July 20, 2027.
https://www.rzn.info/news/2026/11/23/meriya-do-konca-goda-v-shkole-28-v-ryazani-zavershat-ustrojstvo-osnovaniya-zdaniya-357035.html
Support the channel: vote!
Subscribe | Subscribe on MAX | Send news
Location: Ryazan. Town or city — approximate coordinates.
The text was published by the linked source. Its placement on the map does not independently verify the report.