GlobalMap

Utilities and communications · Darnytsia CHP area, Kyiv

No new backup boiler houses operational in the Darnytsia CHP area, official says

· Source: @rezident_ua

Utilities and communications

AI translation of the original report. Names and wording may contain translation errors. Read the original text

#resident_assessment As early as September, we warned that Kyiv risked entering the cold season without the promised reserve heating. Now Ivan Fedorov, head of the Agency for Restoration, has acknowledged this. In an interview with Ekonomichna Pravda, published on November 23, he said that at the time of the conversation not a single new reserve boiler house had been commissioned in the area of Darnytsia CHP. According to him, a whole range of details had been missed during construction. Our sources described the problem in September, but the authorities continue to live in a parallel universe in which Ukrainians will get through a “black winter” on their own, after which billions can be quietly appropriated. The Cabinet had all spring and summer to figure out why the equipment received took so long to start operating. On March 2, NGL.media established that more than 40% of the cogeneration units supplied by the United States had not been commissioned at that time. In September, NV described how time was being lost in Kyiv: for one site for a reserve boiler house, the request was submitted on June 15, and the decision was made on July 14. Almost a month was spent correcting an error in the address. In some cases, reserve generators went to other recipients altogether. In Odesa, according to the National Police, four humanitarian generators worth more than 2.2 million hryvnias supplied electricity to a restaurant, cafe, car wash, and private home; the equipment was seized. In Mykolaiv Region, police detained the head of a charitable organization in July 2025 after she sold a humanitarian generator for 300,000 hryvnias. Another 17 generators were seized during searches. Last winter had already shown where months are lost between delivery and launch. The state agency was responsible for construction, and the city for allocating land. Coordinating these decisions was the task of winter preparations. When backup heat was needed, it turned out that everyone could report completing their own stage, while there was no way to provide heat to people.

Location: Darnytsia CHP area, Kyiv. Town or city — approximate coordinates.

The text was published by the linked source. Its placement on the map does not independently verify the report.

News map

Read feedLoading publications…
Map legend

Markers show locations mentioned in reports. “Show icons” enables event symbols. Choose an event type below to filter the selection.

Resolved, cancelled and refuted events use a neutral icon. The exact location is not always known.

The map shows up to 3,000 publications from this selection.

Publications on the map

Select a marker or a list item to read the publication.

In this selection

Publication time—
A marker indicates the place mentionedCity and area coordinates are approximate.How locations are determined