AI translation of the original report. Names and wording may contain translation errors. Read the original text
A contractor received 1.4 billion rubles to repair a road in Murmansk Oblast and never showed up at the site.
In 2023, Sever Stroy signed a contract to repair the Apatity–Kirovsk highway worth 7.5 billion rubles. The company was paid an advance of 1.4 billion. First, work was postponed due to errors in the project, and after the documents were corrected, the contractor never appeared at the site.
It turned out that the company had practically no workers or equipment left in the region, and its accounts had been blocked by the tax authority. Not even a workers' camp was set up at the repair site. The client now intends to terminate the contract and demand the advance be returned.
The day before, Murmansk Oblast Governor Andrey Chibis was detained. He is being investigated for possible involvement in the embezzlement of more than 39 million rubles and the misappropriation of over a billion during road reconstruction. On November 25, a court will consider what preventive measure to impose on him.
⭐️ Top incidents — 112