AI translation of the original report. Names and wording may contain translation errors. Read the original text
🏢 Three homes have already been built in the capital using large-module construction technology for the Renovation Program: one in Babushkinsky District and two in Cheryomushki.
What is special about it? Almost the entire residential building is assembled at a factory—windows, facades, and engineering systems are installed, and basic finishing is completed. At the construction site, only the finished modules need to be assembled. This is practically a finished apartment of up to 100 square meters.
This approach has several advantages:
▫️ construction time is reduced by 1.5–2 times
▫️ noise levels for residents of neighboring buildings are lower
▫️ custom facades and layouts can be created
▫️ finishing quality is checked at the factory
🔎 A clear example is the residential complex on Letchika Babushkina Street, which was built in just nine months.
— Information modeling (TIM) technologies were used in the building’s design. They made it possible to create a digital model of the property with all the necessary information—from geometric parameters to its maintenance after commissioning, Sergey Sobyanin said.
Large-module construction is not the only technology used for renovation. Volumetric-block construction is also used, in which concrete blocks for individual rooms are manufactured at a factory.
The figure! 142 homes have already been built in Moscow using prefabrication technologies. Since the beginning of 2026, more than 1.4 million square meters of housing have been commissioned under the renovation program.
Video: Sergey Sobyanin’s channels on MAX and Telegram
Subscribe to Vechernyaya Moskva // VM on MAX