GlobalMap

Transport · Ryazan Region

Ryazan Region to receive 1.1 billion rubles for road access to a new bridge over the Oka

· Source: @ria7info

TransportPlanned

AI translation of the original report. Names and wording may contain translation errors. Read the original text

‍🥳Ryazan Region will receive 1.1 billion rubles for the construction of access roads to the new bridge over the Oka Ryazan Region will additionally receive more than 1.1 billion rubles during the period from 2028 to 2030 for the modernization of road infrastructure. The allocation of funds was announced by Andrey Makarov, Chairman of the State Duma Committee on Budget and Taxes and a deputy from Ryazan Region. The financing will be provided through treasury infrastructure loans. “Treasury infrastructure loans are provided to regions at the initiative of our President V.V. Putin. These are targeted, preferential budget loans for implementing development projects in the constituent entities of the Russian Federation. Regions use this money to create and modernize infrastructure, including road construction,” Andrey Makarov said. The total amount of allocated funding will be 1 billion 127 million rubles. These funds are intended to cover the first stage of reconstruction of access roads to the new bridge over the Oka. In particular, the reconstruction of the road on Bolshaya Street in Ryazan, costing 750 million rubles, as well as a section of the Sheremetyevo – Dyadkovo – Vyshgorod – Naumovo – Gaverdovo road in Ryazan District, costing 377 million rubles. Governor Pavel Malkov noted that the region has achieved unprecedented rates of road renewal thanks to the national project “Infrastructure for Life.” “The allocated funds will make it possible to begin creating access roads to the new bridge. This facility is under special supervision. Overall, we will continue the systematic development of the road network. No detail is insignificant here. Both major facilities, the repair of local roads, and safety technologies matter. This year, under the national project, we are repairing more than 20 road facilities with a total length of over 160 km. By November, work had been completed at 11 facilities, and at six more we plan to finish by the end of the year,” Pavel Malkov stressed.

News map

Read feedLoading publications…

Reports from the past 24 hours. This report’s location stays pinned regardless of the date or filters.

Map legend

Markers show locations mentioned in reports. “Show icons” enables event symbols. Choose an event type below to filter the selection.

Resolved, cancelled and refuted events use a neutral icon. The exact location is not always known.

The map shows up to 3,000 publications from this selection.

Publications on the map

Select a marker or a list item to read the publication.

In this selection

Publication time—
A marker indicates the place mentionedCity and area coordinates are approximate.How locations are determined

Location: Ryazan Region. Region — approximate coordinates.

The text was published by the linked source. Its placement on the map does not independently verify the report.